Adjustable Solar Panel Mid End Clamp

Adjustable Solar Panel Mid End Clamp

Adjustable 30mm to 35mm solar panel clamp fits dual frames.
Anodized AL6005-T5 aluminum ensures long-term durability.
Direct China factory supply with complete test certificates.
High-strength solar roof clamp resists extreme wind loads.
Send Inquiry
Chat Now
Description

Product Overview & OEM/ODM Capabilities

The Xiamen Bristar adjustable solar panel clamp is designed to secure framed PV modules ranging from 30mm to 35mm in height. By utilizing a dual-compatibility sliding mechanism, this single component functions as both a mid clamp and an end clamp across varying panel depths. This versatility reduces on-site inventory requirements and simplifies structural planning for EPC contractors.
 

As an established China factory, we provide extensive OEM/ODM manufacturing services. Our in-house engineering team delivers CAD modeling, finite element analysis (FEA), and custom extrusion die development to match specific mounting rail geometries. We accommodate requests for custom anodization thicknesses, specialized packaging, and custom bolt lengths to meet diverse project specifications.
mid clampend clamp

Contact now

 

 
 
Technical Specifications & Materials
Technical Parameter Specification / Material Details
Product Name Adjustable Solar Panel Mid End Clamp
Applicable Module Thickness 30 mm to 35 mm (Adjustable)
Clamp Material High-strength AL6005-T5 Aluminum Alloy
Surface Treatment Clear Anodized (Film Thickness ≥ 10μm)
Fastener Hardware SUS304 Stainless Steel Bolt (M8), Flange Nut, Spring Washer
Ultimate Wind Load Up to 60m/s (per structural calculation)
Ultimate Snow Load Up to 1.4kN/m^2
Compliance Standards AS/NZS 1170.2, JIS C 8955:2017, SGS, ISO9001
Warranty & Service Life 10-Year Warranty, 25-Year Service Life
Packaging Unit Pre-assembled, export-grade double-corrugated cartons

Quality Control & Testing Standards

Our manufacturing facility employs strict quality assurance protocols to guarantee long-term mechanical reliability. Raw material batches of AL6005-T5 undergo optical emission spectrometry to verify aluminum-magnesium-silicon alloy proportions. Every production run is subjected to rigorous pull-out and shear-strength testing on our hydraulic tensile equipment to ensure clamp grip security under simulated wind loads.
 

Surface treatment quality is verified via 240-hour salt spray testing (ASTM B117) to confirm the integrity of the anodized layer against industrial atmospheric pollutants and coastal marine environments. In addition, fasteners undergo torque limits testing to prevent thread stripping during high-speed impact-driver installation on-site.
Typical Application Scenarios
The structural adaptability of our solar roof clamp makes it suitable for multiple array configurations:
1.Commercial rooftop PV plants: Secures commercial-grade 182mm and 210mm modules onto aluminum trapezoidal sheet roof rails.
2.Commercial rooftop PV plants: Secures commercial-grade 182mm and 210mm modules onto aluminum trapezoidal sheet roof rails.
3.Utility-scale solar farms: Provides rapid-mounting solutions on ground-mount aluminum racking structures to accelerate installation schedules.
 

FAQ

Q: How does the adjustable design of the mid and end clamp maintain structural integrity under wind loads of 60m/s?

A: The engineered interlocking groove system on the AL6005-T5 clamp body locks firmly with the rail under tension. Together with high-tensile SUS304 bolts torque-tightened to 15m, this design prevents panel slippage and frame distortion, matching AS/NZS 1170.2 standards up to 60m/s

Q: Does this solar roof clamp support direct grounding for electrical safety across different module frame anodization depths?

A: Yes. The integrated grounding pins pierce the anodized surface of both the 30mm and 35mm module frames during tightening. This creates a continuous, low-resistance electrical path back to the copper ground wire, complying with UL 467 safety standards for electrical bonding.

Q: What is the lead time and packaging configuration for wholesale container orders shipped from your China factory?

A: We deliver standard bulk orders within 10 to 15 days from our Xiamen facility. Clamps are pre-assembled and packed in high-density, double-corrugated export cartons (800 pieces per carton) and securely palletized to guarantee zero mechanical damage during maritime transit.

 

 

 

 

 

Hot Tags: Adjustable Solar Panel Mid End Clamp, China, suppliers, manufacturers, factory, wholesale, customized, sample, in stock